英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:



安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • What is backsight and foresight in surveying? - Expert Civil
    Back Sight: - Backsight is the first reading of a staff (levelling rod) which remains unchanged when the levelling apparatus is taken to another or new point after the levelling instrument is set up and levelled on the first point
  • Home [backsight. com]
    Surveying Software Continuing Education for Surveyors Mappers in Florida Click On The Image Above And Come On In And See What We Got! Copyright © 2019 by GAG Computer Software, Inc All rights reserved
  • 2 Use and Care of Level - IN. gov
    backsight (B S ) is a rod reading taken at a point of known elevation, such as a benchmark or turning point Another term for backsight is plus sight foresight (F S ) is a rod reading taken on a point for which the elevation is to be established A foresight is sometimes called a minus sight
  • BACKSIGHT Definition Meaning - Merriam-Webster
    The meaning of BACKSIGHT is a reading of the leveling rod in its unchanged position when the leveling instrument has been taken to a new position
  • Principle of Levelling - Civil Engineering Portal
    Backsight (BS) or Backsight reading It is a staff reading taken on a point of known elevation, as on a benchmark or a change point This is also called as a plus sight
  • How to calculate height of instrument in surveying - Civil Concept
    In this method, at first Height of the instrument is calculated for each set of the instrument by adding backsight (BS) to the elevation of the benchmark The height of the instrument is nothing but the reduced level of the top of the levelling machine
  • Understanding BS and FS in Surveying - civilguidelines
    Backsight (BS) refers to the process of sighting a previously established point of known elevation, typically a benchmark or a previously surveyed point This serves as a reference for subsequent measurements Essentially, it's the starting point from which all other measurements are made
  • Backsight vs. Foresight — What’s the Difference?
    Backsight is used in surveying to determine a reference point, while foresight is taken towards a forward point to measure elevation differences Backsight involves taking a measurement from a survey instrument back to a previous point to establish a baseline or reference
  • BACKSIGHT definition and meaning | Collins English Dictionary
    2 meanings: 1 the sight of a rifle nearer the stock 2 surveying a reading taken looking backwards to a previously occupied Click for more definitions
  • Backsight Definition for Land Surveyors - Learn CST
    backsight-1 A point used to determine the elevation and or angular orientation of the surveying instrument 2 In leveling, the backsight is the visual intersection of the horizontal cross hair of the instrument with the backsight point or with a staff or rod held vertically over or under the backsight point when the instrument line of sight is l





中文字典-英文字典  2005-2009