英文字典中文字典


英文字典中文字典51ZiDian.com



中文字典辞典   英文字典 a   b   c   d   e   f   g   h   i   j   k   l   m   n   o   p   q   r   s   t   u   v   w   x   y   z       







请输入英文单字,中文词皆可:


请选择你想看的字典辞典:
单词字典翻译
Graveling查看 Graveling 在百度字典中的解释百度英翻中〔查看〕
Graveling查看 Graveling 在Google字典中的解释Google英翻中〔查看〕
Graveling查看 Graveling 在Yahoo字典中的解释Yahoo英翻中〔查看〕





安装中文字典英文字典查询工具!


中文字典英文字典工具:
选择颜色:
输入中英文单字

































































英文字典中文字典相关资料:


  • Gravel Roads: Maintenance and Design Manual - CED Engineering
    Gravel roads are generally main-tained by routine blading and adding gravel as needed either by “spot graveling”or regraveling entire sections However, almost any gravel road will gradually begin to show dis-tress that requires more than routine maintenance to correct
  • Surface Maintenance - Center for Dirt and Gravel Road Studies
    Re-graveling (surface replenishment): Whether doing a full overlay or a skim coat, it is best to reapply quality aggregate, so as not to contaminate or compromise the original aggregate mixture
  • Gravel Roads: Maintenance and Design Manual-- Section I . . .
    Gravel roads are generally main-tained by routine blading and adding gravel as needed either by “spot graveling”or regraveling entire sections However, almost any gravel road will gradually begin to show dis-tress that requires more than routine maintenance to correct
  • Camp Road Maintenance Manual FINAL
    For the purposes of this manual, the terms “gravel road” and “camp road” are used interchangeably and are used to describe private and public roads that are typically narrow and unpaved
  • H:\Design Manual CAD 2023\6. I\6. 06 Temporary Gravel . . .
    Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade it Place the gravel to the specific grade and dimensions shown on the plans, and smooth it Provide drainage to carry water to a sediment trap or other suitable outlet
  • 4. 03 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE EXIT
    To stabilize entrances to the construction site and reduce the amount of sediment transported onto public roads by motor vehicles or runoff Wherever traffic will be leaving a construction site and moving directly onto a public road or other paved area
  • AGGREGATE BASE COURSE SPECIFICATION
    Salvaged asphalt millings will be utilized as base course with a minimum of 6” virgin aggregate base course material above, as approved by the Engineer





中文字典-英文字典  2005-2009